Former Speers Point Quarry
Our work on the former quarry site has ranged from preliminary environmental assessment to strategic planning and assistance in preparing a site specific Development Control Plan (DCP). Our work included identifying potential future options on site and incorporating appropriate concept [...]
Frith Street, Kahibah
de Witt Consulting were responsible for all design works related to sewer and water reticulation for this 25 lot subdivision at Kahibah. Working closely with our client and Hunter Water, we were able to achieve a successful outcome on a [...]
Gap Analysis for Glider Crossing Point, Lake Macquarie
Isolation caused by fragmentation and barriers to movement cause population level problems for a wide range of species. One group; the gliders, are particularly susceptible to the risk associated with gaps. One solution is to close these gaps using [...]
Georges River Boardwalk and Pedestrian Bridge
A Review of Environmental Factors (REF) is being prepared to document likely impacts of the proposal on the environment and to address environmental management requirements. The proposal is located in the Sydney greater metropolitan area in the Liverpool Local Government [...]
Habitat Enhancement for Green and Golden Bell Frog
Habitat enhancement and creation is a critical component of impact management and conservation biology. These two things are intrinsically linked, and one of the main goals of the Biodiversity Conservation Act is to provide equivalence and improve, enhance and [...]
Herald Apartments
de Witt Consulting supported Richard Crookes Constructions (RCC) again on another large scale multi-storey development project within the heart of Newcastle's CBD. As always it is a pleasure to work with the professionalism of RCC. The 'Herald Apartments' constructed at [...]
High Street Waratah – Strata Plan
Working with local Newcastle Builder and developer Josh Ferris on this 3 townhouse boutique development, de Witt Consulting were engaged to manage the strata titling process. For this project this involved preparing the strata plan, assisting with advice and guidance [...]
Internal Fit Outs and Approvals
de Witt Consulting was engaged by a QLD based builder to project manage the Complying Development and Development Application process to enable the roll out and upgrading of various Banking facilities across NSW. This included liaison with private certifiers, designer, [...]
John Holland Rail – Bridge Replacement
Two separate Review of Environmental Factors (REF) were prepared for: a bridge replacement at Mittagong; and bridge removal and construction of level crossing at Cowra. Key environmental issues were heritage, tree removal, noise, visual and traffic impacts. Each REF assessed [...]
John Hunter Hospital Southern Car Park Extension
de Witt Consulting were engaged by John Holland Group (JHG) to supply all surveying services associated with the construction of the John Hunter Hospital Southern car park extension. The scope of the survey included the establishment and installation of site [...]
Kerrabee Tunnel
In preparation for stages 2 and 3 of the remediation, de Witt’s surveying team undertook a laser scan survey of the entire 780 metre length of the tunnel including coordinating the point cloud data from the scans and the design [...]
Kilaben Bay
de Witt Consulting were engaged by the proprietor to Project Manage this 5 lot Staged Torrens Title Subdivision which included:- Management of design of utility services and approvals Management of civil design and the construction certificate process Civil tendering and [...]